£200,000 a year saved for agri-business using new water system

£200,000 a year saved for agri-business using new water system

Cost reduction delivered by switching from towns’ water to river water as a source for the plant was 90%, saving them over £200,000 per year.

World-leading agri-business committed to sustainable agriculture through innovative research and technology.

Project:

When water droughts hit manufacturing plants which require water as part of their processing, they are faced with serious issues.

Most water authorities in the UK put pressure on businesses to find alternative sources to traditional towns mains.

To find a solution, the client called on the expertise of AFS.

The clients site made is up of a number of individual plants each with their own evaporative cooling tower. AFS needed to devise an effective method of utilising river water, which is in abundance near the clients site, as an alternative to the towns’ mains supply.

Solution:

Using river water as a source for large scale cooling towers is not normally a viable option due to contamination, but AFS found a solution.

AFS devised a complex but efficient self cleaning, automatic water filtering system which purified the river water down to 15 micron with up to 90% efficiency.

“AFS came in and sorted things in double quick time. Their efficiency and technical expertise is impressive and their customer service is always top notch.”

The system was demonstrated on a plant that typically used up to 30 cubic meters of water per hour. In the past this volume of towns’ water would have equated to £30 per hour which over a year equated to a cost of £240,000.The system was demonstrated on a plant that typically used up to 30 cubic meters of water per hour. In the past this volume of towns’ water would have equated to £30 per hour which over a year equated to a cost of £240,000.

The resulting cost reduction delivered by switching from towns’ water to river water as a source for the plant was 90%, saving them over £200,000 per year. Payback on the deployed systems was achieved in less than 18 months.

As soon as it became clear how effective this solutions was the client asked AFS to roll this solution out to the remaining plants on-site.

“Delivering such impressive cost reductions and enabling us to switch water use has had a significant impact on the plants future and profitability. I wouldn’t hesitate to recommend AFS to anyone.”

Services Provided
  • System analysis and review
  • Monthly service and maintenance
  • Water purification and filtration
Customer Benefits
  • Annual savings on one plant of over £200,000
  • Guaranteed uninterrupted water supply
  • Significant resource acquisition costs
Processes Covered
  • Plant design and systems engineering
  • Water filtration
  • Ongoing service and support
Details
  • The Paraquat plant uses up to 30 cubic meters of water per hour
  • Water purification and filtration up to 15 micron
  • 90% cost reduction
  • 18 month payback
Project Notes
  • The savings at the plant have now been rolled out to the clients remaining plants
  • It only took AFS four months to complete the project and just 18 months project payback